|
LEGAL NOTICE
REQUEST FOR QUALIFICATIONS FOR
ASBESTOS ASSESSMENT
PRIOR TO DEMOLITION
The ABC Water and Storm Water District intends to contract for asbestos assessment services which are required before the demolition of Market Street Elementary School located at 5555 Market Street, Boardman, Ohio 44512. Statements of qualifications should include information regarding the firm’s history, education and experience of owners and key technical personnel, the technical expertise of the firm’s current staff, the firm’s experience in performing similar work, availability of staff, the firm’s equipment and facilities as well as the laboratory that will be used, current Ohio abatement specialist or evaluation specialist license(s), references; any previous work performed for the Board of Boardman Township Trustees, and/or ABC Water and Storm Water District.
Statements of qualifications should be transmitted by 3:00 PM, November 5, 2021 to:
ABC Water and Storm Water District
P.O. Box 3554
Boardman, Ohio 44512
or hand delivered to:
Boardman Township Government Center
8299 Market Street
Boardman, Ohio 44512
Attn: Jason Loree
As required by Ohio Revised Code Section(s) 153.64-71, responding firms will be evaluated and ranked in order of qualifications. The project description is as follows:
Asbestos Assessment Report: ABC Water and Storm Water District has acquired the Market Street Elementary School located at 5555 Market Street, Boardman, Ohio 44512. The school will be demolished in order to build a storm water facility that includes daylighting a tributary of Cranberry Run. The current AHERA report for the school building lists suspected asbestos containing material but shows no evidence of sampling of plaster, roofing materials, caulking, etc. The successful firm will be required to sample material, provide sample testing and provide guidance regarding abatement of same.
The Statement of Qualifications must be submitted in the following format:
•List of similar projects, with references. (2 page max.).
•List of Sub-consultants, if any (1 page max.).
•List of Project Manager and other key members (2 page max.).
•Description of Capacity of Staff and their ability to perform work in a timely manner (1 page max.).
•Description of Project Approach, (2 page max.)
With Cover Letter, the submittal must be a maximum of only nine (9) pages, using 8 ½” x 11” single sided paper with a 12 point font and minimum 1” margins. Bind each submittal with a single staple in upper left corner only. Please provide seven (7) copies. |
|